
MINE–PLANT–PORT PREFEASIBILITY STUDY – PERU

REDCO developed a prefeasibility study aimed at defining a strategic solution for the development of a copper–molybdenum deposit. The work was based on the application of the Hill of Value (HOV) methodology, which made it possible to assess different combinations of extraction and recovery methods in oxide, sulphide and mixed zones, considering multiple production rates and their impact on project viability.
The analysis included the estimation of investments in the mine, plant and port, providing a comprehensive framework for decision-making. Finally, a robust alternative was consolidated at PFS level, with clear growth paths and a scalable and sustainable development plan.
Services:
- Prefeasibility study with analysis of recovery and extraction methods.
- Assessment of the impact on mine, plant and port Capex.
