Mining engineering covers a wide variety of activities, such as engineering projects (Scope, Conceptual, PFS, FS), bankable reports (NI 43-101/JORC), mine design and planning, equipment selection, infrastructure sizing, CAPEX and OPEX estimation and financial evaluation. It involves carrying out trade-offs analysis: (Exploitation Methods, Alternative Technologies, Materials Handling Systems, Others).
Engineering projects (Scope, Conceptual, PFS, FS) and fundable reports (NI 43-101/JORC).
Mine Design and Planning with Systemic Characteristics.
Selection and sizing of equipment.
Sizing of viable services and infrastructure.
CAPEX and OPEX Estimation and Financial Evaluation.
Trade-Offs Analysis: (Exploitation Methods, Alternative Technologies, Materials Handling Systems, Others).
Evaluation Considering Different Technologies (e.g. Classification / Continuous Transportation / Others).
Variable Cutting Law and Cost Models.
Integrated Design - Sequencing - Three-Dimensional Planning.
Insertion of Early Technologies.
Integrated design, sequencing and planning
Technology assessment / For example, Rail Veyor
Improvements in recovery and dilution by 5%.
Increase in value by 15% compared to the current case.